Skip to main content

Sixth Form

Institution: St Teresa's Effingham

Location: Dorking, Surrey

Requirements: PE Hall transformation to a Sixth Form

Not only does the new space accommodate future Sixth Form growth, but it also provides exceptional flexibility doubling as an ideal venue for sta­ff meetings, community gatherings, and parent events

Their Requirements

With a growing Sixth Form, the school needed to rethink its existing space provision and create an environment that could support students throughout the day. A redundant PE hall was identified as the ideal location for a new breakout and dining area. The school required a multifunctional space that would o­er flexible zones for eating, studying, and socialising within a modern, uplifting setting.

The Solution

Westcountry Group delivered a full turn-key transformation of the hall, creating a warm and welcoming space tailored to the needs of Sixth Form students. Design challenges, such as the sloping ceiling, were addressed with stylish suspended acoustic rafts, while a beautifully crafted servery counter enables hot and cold food to be served throughout the day. A variety of tables and seating configurations ensures the space can adapt e­ortlessly to multiple uses, giving students a comfortable place to eat, work, and connect.

The Result

The school are delighted with the outcome, which has been widely praised by students, parents, and sta­ alike. Not only does the new space accommodate future Sixth Form growth, but it also provides exceptional flexibility doubling as an ideal venue for sta­ meetings, community gatherings, and parent events.

Contact Us